Most compliance services are sold as a vague promise and a blank timesheet. This one is not.
Here is the entire BIR-Proof SAP Program laid out: every deliverable, what it does for you, how it is priced, and what happens if we miss.
Who this is for
You run SAP in the Philippines and you issue invoices, receipts, or books of accounts out of it. That includes:
- SMEs on SAP Business One
- Mid-market companies on GROW with SAP
- Large taxpayers and conglomerates on RISE with SAP or S/4HANA on-premise
- Anyone still on SAP ECC who is migrating before December 2027
If that is you, the BIR expects your system to be registered as a Computerized Accounting System and certified on the Electronic Invoicing System by December 31, 2026.
What you get
Stage 1: CAS Registration. Complete Annex A documentary pack, Annex B technical requirements matrix, sworn statement, and filing at your RDO or LT Office. Deliverable: your Acknowledgement Certificate, in hand.
What it does for you: Your SAP system is legally registered to generate invoices and books. That is the foundation everything else sits on.
Stage 2: EIS Readiness Assessment. Field-by-field mapping of your invoice, receipt, and billing data against the BIR JSON schema. Document-type coverage check, including the ones teams miss: intercompany billing, partial credits, multi-currency exports. Written coverage classification.
What it does for you: You get a documented answer to “do we actually have to do this,” and a documented list of exactly what is missing.
Stage 3: SAP Integration Build. For RISE, GROW, and S/4HANA: a BTP Integration Suite build that originates documents at the point of posting, maps them to the BIR schema, signs and encrypts them, and transmits with error routing. For Business One: an EIS layer built on the Philippine Tax Module.
What it does for you: Invoices are compliance-ready the instant they are created. No manual re-entry. No batch job. No spreadsheet.
Stage 4: Sandbox Testing and E-Certification. Registration on the EIS Certification Portal, end-to-end sandbox test cycle, fixes, and your EIS Certificate.
What it does for you: The first sandbox run is where a self-built retrofit is most likely to fail: a null-handling convention, a branch code in the wrong field, a TIN formatted as a number instead of a nine-digit string. We find those in testing, not in production.
Stage 5: Permit to Transmit. PTT application for every qualifying branch and entity.
What it does for you: Certification alone does not authorize you to transmit. The PTT does. We make sure every branch has one.
Stage 6: Transmission Monitoring. Live dashboard, exception queue with named ownership, ten-year retention management, and reconciliation to your 2550Q VAT return.
What it does for you: “Did that invoice go through” stops being a question. Your VAT filings and your EIS transmissions tell the same story.
Stage 7: Re-Registration After Migration. Major-change assessment, new Acknowledgement Certificate timed to cutover, old PTU or AC surrendered.
What it does for you: If you are moving from ECC to S/4HANA, you build compliance in once, not twice.
Bonuses included at no additional fee
- BIR Deadline War Room template pack (branch inventory, PTT tracker, key-rotation calendar)
- Finance-team training on the Invoice-as-primary-document rules under the Ease of Paying Taxes Act
- Quarterly transmission health checks for 12 months after go-live
- Priority re-registration slot if you later migrate to S/4HANA
How it is priced
Every engagement is fixed-fee and scoped to your SAP line. Indicative ranges:

Compare that against PHP 10,000 per day in penalties, or 0.1% of your annual net income, whichever is higher.
Start small: the Readiness Audit
You do not have to buy the whole program on day one.
The CAS + EIS Readiness Audit is a fixed-scope, two-week engagement, priced between PHP 75,000 and PHP 150,000 depending on your entity count, and fully creditable against a full engagement.
You get Stages 1 and 2 as a written report: your coverage status, your current registration status, every field gap, and a costed plan to close them. If you decide to proceed, the audit fee comes off the top. If you decide to do it yourself, you have the roadmap.
What we guarantee
Certified with your Permit to Transmit before your deadline, or we keep working at no additional professional fee until you are.
We can make that promise because we scope honestly, we start with the audit, and the people doing the work understand both halves of the problem: our compliance lead is a CPA and SAP consultant, and our ABAP team has taken SAP systems through CAS registration and knows what the BIR’s technical requirements look like inside the system.
Why the timing matters
The build takes six to ten weeks. The BIR’s certification queue gets longer as the deadline approaches. We cap the number of build slots we take per quarter so every client gets certified on time.
Slots go to companies that start first.
Book Your Free 20-Minute Readiness Call
